dalong@dalonmachine.com

+86-13567788178

Product Categories

Contact Dalong Machinery


Address: 707#,Binhai 8th Rd., Wenzhou Eco&Tech Development Zone, Longwan District, Wenzhou, Zhejiang, China


CONTACT: Sally Young

Cell:+86 13567788178


TEL:  +86-577-86526789

FAX: +86-577-86502588


Sales Email: 

dalong@dalonmachine.com

overseasales@dalonmachine.com


Website: 

www.dalongmachinery.com

https://dalonmachine.en.alibaba.com 

 

WhatsApp:+86 13567788178

WhatsApp:+86 15869602225


Home > News > Content
Setting Machine Operating Procedures Aug 25, 2017

The stereotypes machine is used in the machine for stereotypes, and the stereotypes can be divided into upper forming machine, sock setting machine and fabric setting machine.

Operating procedures

1 boot

1.1 Click the cloth button to enter the cloth into the operator interface, click the upper left corner of the cloth control switch to red.

1.2 Click on the outgoing mechanism button to enter the cloth distribution operator interface, click on the upper left corner of the total control switch to red.

1.3 Press the reset button "RESET" on the operation panel, the indicator light is off, the power-on indicator flashes, the power-on indicator, the chain rotation, and the acceleration indicator flash.

1.4 Click the oven button to enter the heating system:

A. Click the cycle fan icon to enter the cycle fan power setting window, click the cycle fan total button pop-up fan fan power settings small window, click the white bottom of the digital box pop-up numeric keypad, enter the required output power value, press OK.

B. Click on the upper left corner or the upper right corner of the exhaust fan schematic icon into the exhaust fan power setting window, click the manual control button and confirm, click the white box to pop up the small number of numeric keys to enter the required value and confirm. If you click the automatic control button and confirm that the fan will automatically adjust the size of the exhaust fan power.

Click the number box in the oven simulation icon to enter the heating window, click the heating total to set the heating temperature, or set the heating temperature of each oven separately. Heating temperature below 90 degrees click on the small fire icon for heating, heating temperature above 90 degrees, click the fire icon to heat and confirm.

1.5 Put the cloth on the cloth through the cloth to the console. ).

1.6 The red stop button on the operation panel, the chain operation stops, and the power-on indicator flashes. The guide cloth on the tuck chain and press the overfeeding wheel down button for 10 seconds or so, to be pressed under the button light. Open the cloth into the various parts of the motor to "1". Raise the grouting tank, hit the rolling pressure, open the console parts of the motor (in addition to the needle to protect the entrance button), click on the cloth into the upper left corner of the cloth into the overall control button to green.

1.7 to start the first half of the machine, to be guided over the needle after the protection of the entrance to open the needle on the protection of the entrance button to "1", to be out of the oven to reach the cloth over the feed when the stop, the cloth and the cloth The conduction band is connected. Click on the cloth out of the overall control button to the green, open the cloth part of the motor to "1" (in addition to the cooling cylinder tension motor switch) to restart the machine to guide cloth into the rack after the shutdown. Open the cooling cylinder tension motor switch to "1".

1.8 Click on the bar chain control button to enter the chain control interface, according to the process card on the process requirements input width and

1.9 According to the process card to find the cloth to be processed to push into the cloth at the cloth, chemical materials and into the pouring tank (drain 20L before). According to the organization of the fabric to be processed and the process requirements of the package roll or car loaded. Set the parameters of each part, according to the weft of the cloth to be processed in the pre-set weft fast / slow, fast / fast right. Press the boot button to start the boot, to be ring back after pressing the power button to accelerate the flashing lights, set the process requirements of the speed and confirmation, click the acceleration button speed automatically increased to the process requirements speed.

2 stop

2.1 After the cloth is finished, the guide cloth is introduced into the console, the guide cloth is ripped, and the main control button is clicked to red, and the upper needle protection button is closed to "0". Start the second half of the machine, to be the first cloth to reach the cloth over the feed when the load off the machine, the guide cloth and conduction band connection, turn off the cooling cylinder tension motor to "0" to start the machine half of the machine to the cloth out of cloth out. Close the cloth out of the total control button to red, start the machine to let the chain idling.

1.2 Press the oven button to enter the heating system interface, set the heating temperature of 150 degrees, 50% of the circulating fan power, exhaust fan manual control and 100% power ventilation, which can effectively remove the residual moisture in the oven, which play Maintenance of the role of the oven. After about 30 minutes of operation, turn off the heating system so that the circulating fan and the exhaust fan continue to run until the oven temperature drops below 100 degrees and then closed.

2.3 closing the cabinet power control switch to the "OFF", the computer automatically stores the processing data after the closure of the machine for cleaning work.