dalong@dalonmachine.com

+86-13567788178

Product Categories

Contact Dalong Machinery


Address: 707#,Binhai 8th Rd., Wenzhou Eco&Tech Development Zone, Longwan District, Wenzhou, Zhejiang, China


CONTACT: Sally Young

Cell:+86 13567788178


TEL:  +86-577-86526789

FAX: +86-577-86502588


Sales Email: 

dalong@dalonmachine.com

overseasales@dalonmachine.com


Website: 

www.dalongmachinery.com

https://dalonmachine.en.alibaba.com 

 

WhatsApp:+86 13567788178

WhatsApp:+86 15869602225


Home > News > Content
Setting Machine Operating Oct 31, 2017

Forming machine equipment: Maintenance methods:

1, the cylinder (Dg1100 × 6): welded by the steel plate. Tube can not be long-term water (steam cooling water), the wet heat after the cooling water should be drained clean and dry, and regularly check whether the surface of the paint off and rub, out of the phenomenon, if any, should be timely fill the high temperature Rust paint to prevent local rust. Note: When using the maximum vacuum does not exceed 0.07MPa (actually more than 0.06MPa in general), to prevent instability.

2, stereotypes machine jacket: welded by the steel plate. For dry heat setting. Mainly carried in the head 45 ° fold. Maintenance, in accordance with the drawings required jacket appearance plus 80-100 mm asbestos cement insulation layer, and after each use of the jacket will be exhausted.

3, 2 support tube and 11 accessories tube: maintenance check the teeth are intact, the installation of the pipe before the application of molybdenum disulfide and other anti-corrosion lubricants, flange joints in the installation of mats to ensure that a variety of trachea Do not leak, do not leak.

4, styling machine activity circle, fixed block, roller, rack, handle and other components: Note that the thread or other dirt embedded in the wheel, affecting the rotation. If the wheel is sluggish, it may be appropriate to release the compression screw.

5, the stereotypes of various pressure gauges, thermometers, safety valves, jackets, vacuum table, etc.: For these instruments, must be used to meet the specifications of the specifications, to achieve the required range of measurement and accuracy; regularly check its sensitivity, accuracy, reliability.

Stereotypes of the operating procedures

1 boot

1.1 Click on the cloth into the cloth into the operator interface, click the upper left corner of the cloth into the total control switch to red.

1.2 Click on the cloth release button to enter the operator interface, click on the upper left corner of the total control switch to red.

1.3 Press the reset button "RESET" on the operation panel, the indicator light is off, the power-on indicator flashes, the power-on indicator, the chain rotation, and the acceleration indicator flash.

1.4 Click on the oven button to enter the heating system: Wuxi Shen letter machinery: stereotypes of the operating procedures

a. Click the cycle fan icon to enter the cycle fan power setting window, click the cycle fan total button pop-up fan power setting window, click the white bottom of the digital box pop-up numeric keypad, enter the required output power value, press OK.

b. Click on the upper left corner or the upper right corner of the exhaust fan schematic icon into the exhaust fan power setting window, click the manual control button and confirm, click the white box to pop up the small number of numeric keypad to enter the required value and confirm. If you click on the automatic control button and confirm that the fan will automatically adjust the size of the exhaust fan power.

Click the number box in the oven simulation icon to enter the heating window, click the heating total to set the heating temperature, or set the heating temperature of each oven separately. Heating temperature below 90 degrees click on the small fire icon for heating, heating temperature above 90 degrees, then click the fire icon to heat and confirm.

1.5 the right cloth through the cloth line into the cloth part of the guide cloth 9 from the rack to the console), along the correct route to wear the cloth out of the part of the conduction band (from the over-feeding roller to the cloth ).

1.6 The red stop button on the operation panel, the chain operation stops, and the power-on indicator flashes. The guide cloth will be pulled on the tuck chain and press the over-feed wheel down button for 10 seconds or so, to be pressed under the button light. Open the cloth into the various parts of the motor to "1". (Except for the upper needle protection entrance button), click on the cloth into the upper left corner of the cloth into the overall control button to the green button.

1.7 to start the first half of the machine, to be guided over the needle after the protection of the entrance to open the needle on the protection of the entrance button to "1", to be out of the oven to reach the cloth over the feed when the stop, the cloth and cloth The conduction band is connected. Click on the overall control button to the green, open the cloth part of the motor to "1" (in addition to the cooling cylinder tension motor switch) to restart the machine to guide the cloth into the rack after the shutdown. Open the cooling cylinder tension motor switch to "1".

1.8 Click on the bar chain control button to enter the chain control interface, according to the process card on the process requirements input width and

1.9 According to the process card to find the cloth to be processed to push into the cloth at the cloth, the chemical materials and into the pouring tank (before leaving 20L). According to the processing of the cloth to the processing conditions and process requirements of the package roll or car mounted. Set the parameters of each part, according to the weft of the cloth to be processed in the pre-set weft fast / slow, fast / fast right. Press the boot button to start the boot, to be back to the bell after pressing the power button to accelerate the flashing lights, set the process requirements of the speed and confirmation, click the acceleration button speed automatically increased to the process requirements speed.

2 stop

2.1 After the processing of cloth to guide the cloth into the console, tearing the guide cloth, click into the cloth total control button to red, close the needle to protect the entrance button to "0". Start the second part of the machine, to be the first cloth to reach the cloth over the feed when the machine stopped, the guide cloth and conduction band connection, turn off the cooling cylinder tension motor to "0" to start the second part of the machine to the cloth out of cloth out. Close the cloth out of the total control button to red, start the machine to let the chain idling. Wuxi Shen letter machinery: stereotypes of the operating procedures

2.2 Click the oven button to enter the heating system interface, set the heating temperature of 150 degrees, the circulating fan power of 50%, the exhaust fan manual control and 100% power ventilation, which can effectively remove the residual moisture inside the oven, which play Maintenance of the role of the oven. After about 30 minutes of operation, turn off the heating system so that the circulating fan and the exhaust fan continue to run until the oven temperature drops below 100 degrees and then closed.

2.3 closing the cabinet power control switch to the "OFF", the computer automatically stores the processing data after the closure of the machine to clean work.